AIThis post was created with the assistance of artificial intelligence (AI).

TL;DR

A GreenBuildingAdvisor contributor added a Refoss EM16P electricity monitor to an HVAC subpanel by placing the monitor in a separate enclosure above the panel. The installation also required an additional breaker; the report stresses that panel work carries safety and code risks and should be handled by a licensed electrician when the homeowner lacks the necessary expertise.

A homeowner who had been monitoring electricity use in an all-electric house since 2022 found a way to add a Refoss EM16P monitor to a crowded HVAC subpanel: install a separate enclosure above it for the monitor itself. The GreenBuildingAdvisor report describes the physical and wiring challenges, including an extra breaker, and warns that electrical panel work can be dangerous and subject to local code requirements.

Before you orderOffer from Amazon

Get backup power and energy gear delivered free with Prime

  • Fast, free delivery on millions of items
  • Prime Video, Amazon Music and more included
  • Member-only deals all year
Start your free Prime trial Free trial for eligible customers · Cancel anytime
As an affiliate, we earn on qualifying purchases.

The author’s electrical system grew more complicated after a basement remodel. It now includes a 200-amp main panel, a basement subpanel, an HVAC subpanel, a panel beneath the meter and a photovoltaic system. The author already had three electricity monitors installed but wanted another to track the HVAC subpanel, which supplies two main heat pumps.

The subpanel had space for the monitor’s current transformers (CTs), which sense current in the circuits, but not for the monitor unit those CTs connect to. The author said the Refoss EM16P was too large to fit inside the panel. Rather than abandon monitoring the heat pumps, the author mounted a separate weatherproof electrical enclosure above the subpanel and connected the two with conduit and fittings.

The setup also required a separate breaker to provide the monitor with power and a voltage and phase reference. The panel had two double-pole 40-amp heat-pump breakers and a 20-amp breaker for an outdoor receptacle. The author said the receptacle breaker provided a reference for one side of the panel, but the heavier-gauge heat-pump wiring made a standard pigtail unsuitable for the other. The report says the author installed another breaker identical to the receptacle breaker. The source excerpt does not include the full subsequent explanation of that wiring or the complete installation details.

At a glance
reportWhen: Published in a GreenBuildingAdvisor rep…
The developmentA homeowner reported finding a way to fit an electricity monitor onto a crowded HVAC subpanel by installing a separate enclosure and adding a breaker.

Monitoring a Crowded HVAC Panel

The report offers a practical example of a limitation that can arise when homeowners try to add energy monitoring to existing electrical systems: the panel may have room for CTs but not for the monitor hardware. A separate enclosure can address the space constraint, but the account makes clear that fitting equipment is only one part of the job. The monitor also needs suitable electrical connections to measure voltage and phase, and those connections cannot be improvised without regard to conductor size, equipment instructions and applicable code.

For readers tracking the electricity use of heat pumps, circuit-level monitoring may help distinguish HVAC consumption from the rest of a home’s load. The report describes the author’s installation and says it has worked since completion, but it does not provide measured energy savings, performance testing or evidence that the same arrangement will suit other panels. Its main practical takeaway is that a seemingly simple monitoring project can involve enclosure design and panel wiring that call for professional judgment.

Products Worth Considering

Autel Level 2 Home Smart EV Charger with NACS Connector, 50 A, 240 V, 25-Foot Cable

Autel Level 2 Home Smart EV Charger with NACS Connector, 50 A, 240 V, 25-Foot Cable

Autel MaxiCharger AC Home Level 2 EV Charger, 50A, J1772, Wi-Fi, Hardwired, 25 ft Cable

Autel MaxiCharger AC Home Level 2 EV Charger, 50A, J1772, Wi-Fi, Hardwired, 25 ft Cable

Autel MaxiCharger Level 2 50A Home EV Charger with J1772 Connector and 25 ft Cable

Autel MaxiCharger Level 2 50A Home EV Charger with J1772 Connector and 25 ft Cable

As an affiliate, we earn on qualifying purchases.

From One Panel to Several

The author said monitoring began in 2022, when the house had one electrical panel and the project was straightforward. A later basement remodel added electrical complexity, alongside the home’s existing heat pumps and photovoltaic system. The author now has three monitors installed and described the HVAC subpanel as the remaining difficult location.

The panel’s manufacturer and design helped make the reported approach possible. According to the account, the Square D subpanel had an opening at the top, allowing the author to connect a weatherproof enclosure with compatible fittings and conduit. The author used one-inch conduit and said it was just large enough for the installation. The enclosure’s knockout was difficult to remove and required drilling, a detail that contributed to the time and effort involved.

The author reported making multiple trips to hardware stores and spending about 30 hours putting the assembly together. That is the author’s account of this particular project, not an estimate of how long similar installations generally take.

““My HVAC subpanel didn’t want an electricity monitor, but I gave it one anyway.””

— The GreenBuildingAdvisor report’s author

Limits of the Installation Report

The supplied report excerpt ends while the author is explaining the additional breaker, so it does not show the full wiring description or the final details of how the monitor’s reference connections were completed. It also does not identify the applicable local electrical code, state whether an inspection or permit was required, or provide independent verification of compliance.

The account does not report the monitor’s readings, the amount of electricity used by the heat pumps, or any change in energy bills. It says the system has been working since installation, but does not specify how long it had operated when the report was written. The author’s solution should not be treated as a universal installation plan: panel layouts, equipment, wiring and local requirements differ.

Professional Review Before Panel Work

The report does not announce a product release, regulatory decision or scheduled follow-up. The immediate next step for anyone considering a similar installation is to check the monitor manufacturer’s instructions and local electrical requirements, then consult a licensed electrician if the work involves opening or modifying a panel. The author specifically cautions that the panel must be confirmed de-energized before touching components; turning off a breaker alone is not proof that the equipment is safe.

Whether this arrangement is appropriate for another home depends on the available enclosure space, panel design, conductor sizes and permitted wiring method. Readers should not infer that the extra-breaker approach described here is code-compliant in every location. The source provides no broader guidance or later testing, so any assessment of the installation’s long-term performance remains specific to the author’s account.

Key Questions

What problem was the homeowner trying to solve?

The author wanted to monitor two heat pumps supplied by an HVAC subpanel. The panel had room for the current transformers but not for the Refoss EM16P monitor unit.

How did the author make room for the monitor?

The author installed a separate weatherproof enclosure above the subpanel, connecting it with fittings and conduit. The report says a top opening in the Square D panel helped make the connection possible.

Why did the installation involve another breaker?

The monitor needed power and voltage and phase references for both sides of the panel. The author said the existing heat-pump wiring was too heavy for the standard pigtail arrangement, and reported adding a breaker. The supplied excerpt does not provide the complete wiring explanation.

Is the described installation safe to copy?

The report does not present the setup as a universal guide. Electrical panel work can cause injury or property damage, and local codes vary. The author advises verifying that a panel is de-energized and contacting a licensed electrician if the reader is unsure.

Source: rss

You May Also Like

The Senate Wants To Pass A Permitting Reform Bill. So What’s The Holdup?

Senators aim to finish a permitting reform bill after the midterms, but disputes over environmental rules, energy costs and data centers remain.

Apple Debuts $129 AirPods 5 With Better Noise Cancellation And Transparency Mode

Apple introduces the new AirPods 5 at $129, featuring enhanced noise cancellation and transparency mode, marking a significant update in its wireless earbud lineup.

European Heat Pump Sales On The Rise

Interest in European heat pump sales is rising again after a recent slowdown, but no single trigger for the renewed attention has been confirmed.

SpaceX wants to launch 100k more Starlink satellites for 100x the bandwidth

SpaceX announced plans to deploy 100,000 additional Starlink satellites, aiming to increase bandwidth by 100 times. The project is in early planning stages.